Wittenberg University

Blair Hall Renovation

Project Overview

Heapy designed the Mechanical-Electrical systems for the 28,000 SF renovation of Blair Hall. Blair Hall houses the department of education, which includes classrooms, offices, computer labs, and the department of theatre including a black box theatre.

The project includes the complete replacement of all of the plumbing, heating, ventilating, and electrical systems in the building including all piping, ductwork, conduit, wire and equipment.

It includes a new HVAC system including a new chiller and while providing a complete fire suppression system for the entire building. The renovation utilized the existing steam service to heat the building.

This project is LEED Gold. This project was certified under the LEED for New Construction rating system.

This project was awarded a 2010 ABC Excellence in Construction Award.

Details:

COST
$4,000,000
SIZE
28,000 SF

Markets:

Thought Content

Planning for the New Normal
Plumbing Systems Re-Occupancy and Ongoing Operations

Your building may have been shut down these past many months due to WFH/COVID. Minimal use of your building’s water systems creates stagnant water in your plumbing system piping and equipment, which promotes the growth of Legionella and/or other biofilm-associated bacteria. This places your building occupants at risk when re-occupancy occurs. Now is the time to develop and implement a safe and effective Water Management Plan to protect your building occupants, maximizing their health and safety upon re-occupancy.

Read More