Kettering Health Miamisburg Main Switchgear Replacement
Cost $1,760,824
HEAPY Solutions provided Kettering Health turnkey project services associated with the replacement of Unit Substations and T-1 Transformer serving all normal power distribution at Kettering Health Miamisburg. This project upgraded the medium voltage distribution system and completely replaced the 480V normal power distribution, which required the shutdown of both utility feeds to the hospital.
HEAPY Solutions, in collaboration with the electrical contractor, provided complete distribution of normal power throughout the project. Multiple weekend-night shutdowns were required to prevent interruptions to building operations that would have negatively impacted the hospital’s ability to serve patients. Transforming the single-ended substation to a double-ended substation improved resiliency for the campus’s overall electric and power systems. The hospital remained fully functional and operational throughout the project, which required extensive planning and coordination to limit disruptions.