Mercy Health

Anderson Hospital

Project Overview

HEAPY provided Commissioning Services for the $74 million expansion which adds 90 private patient rooms, an 18-bed inpatient rehabilitation unit, a 21-bed medical-surgical intensive care unit, an expanded surgical suite and three new 30-bed units devoted to surgical and orthopedic patients in a five-story, 150,000 SF tower. Other renovations took place in the Family Birthing Center, operating suites and cafeteria.

HEAPY Solutions provided a complete engineering led turnkey project to replace and upgrade the Mercy Anderson Hospital Main Kitchen Hood with minimum impact to the kitchen operation. The turnkey solution included design, permit, bidding, management and construction associated with the kitchen upgrade. The project included cleaning of the existing grease ductwork, installation of a fire barrier, shaft wall, grease access doors, replacement of the main kitchen hood, and grease exhaust fan. Also included in the project was the installation of a variable exhaust hood control system, a fire alarm interface, remote monitoring by the building DDC system and a restoration of the kitchen finishes.

Details:

COST
$74,000,000
SIZE
150,000 SF

Markets:

Thought Content

Planning for the New Normal
Plumbing Systems Re-Occupancy and Ongoing Operations

Your building may have been shut down these past many months due to WFH/COVID. Minimal use of your building’s water systems creates stagnant water in your plumbing system piping and equipment, which promotes the growth of Legionella and/or other biofilm-associated bacteria. This places your building occupants at risk when re-occupancy occurs. Now is the time to develop and implement a safe and effective Water Management Plan to protect your building occupants, maximizing their health and safety upon re-occupancy.

Read More