Miami University
Project Overview
Heapy is currently providing Fundamental and Enhanced Commissioning Services for the renovation of Clawson Hall, a 123 bed dormitory on Miami University’s Western Campus. The renovations will upgrade the electrical systems, HVAC systems, sprinkler / fire suppression systems, roofing improvements and provide a brand new interior design.
Commissioned Building Systems include:
HVAC Systems
Dedicated Outdoor Air Units
Air Terminal Units (15%)
Fan Coil Units (15%)
BCUs
Chilled Water Pumps
Steam-Hot Water Converter
Hot Water Pumps
Condensate Pump
DDC Controls
Plumbing Systems
Domestic Hot Water System
Domestic Hot Water Recirculation Pump
Domestic Water Treatment
Electrical Systems
Interior and Exterior Lighting Control Systems
Arc Fault Receptacle Testing – Student Rooms
Motor Starter
Variable Frequency Drive
Electric Gear Thermography
Life Safety Systems
Fire Alarm
Building Systems
Envelope Thermography
Elevator System
Thought Content
Planning for the New Normal
Plumbing Systems Re-Occupancy and Ongoing Operations
Your building may have been shut down these past many months due to WFH/COVID. Minimal use of your building’s water systems creates stagnant water in your plumbing system piping and equipment, which promotes the growth of Legionella and/or other biofilm-associated bacteria. This places your building occupants at risk when re-occupancy occurs. Now is the time to develop and implement a safe and effective Water Management Plan to protect your building occupants, maximizing their health and safety upon re-occupancy.