Financial Institution

Project Overview

Heapy provided commissioning services for fire suppression, heating, ventilating, air conditioning, electrical and technology systems associated with the data systems support infrastructure for the Bank and Vantiv tenant space at the Fifth Third Bank, CSC I and CSC II, Grand Rapids, Michigan site. Both sites were fully functional during all testing of new and existing systems with no outages.

Heapy commissioned the following building systems:
Chilled Water System
Air Handling Systems
Heating/Cooling Systems
Heat Pump Units
Automatic temperature controls system
Lighting Control Systems
Terminal Units
Main Distribution Switchgear
Emergency Generators
Emergency Distribution Switchgear
Paralleling Switchgear
Automatic Transfer Switches
Static Transfer Switches
Uninterruptable Power Systems
Battery Backup Systems
Battery Monitoring Systems

The projects had an estimated construction cost of $4.5 million.

Details:

COST
$4,500,000
SIZE
15,000 SF

Markets: