Herald Building

Herald_BuildingHeapy Engineering provided LEED Commissioning Services for the 45,000 SF Herald Office Building.The first floor includes commercial areas, offices and storage.  The second and third floor offices are intended for use by Children’s Hospital.

Commissioning services for this project include:

  • Hot Water Boiler System (including associated pumps)
  • Cooling Towers
  • Make-Up Air purposes
  • Exhaust Ventilation Systems
  • Heat Pump Units
  • Automatic temperature control system
  • Lighting Controls Systems to meet LEED Energy Credit criteria
  • Domestic water generation, distribution, pumping and mixing systems required to meet LEED Water Efficiency Credit criteria
  • Heat Pump Units

Heapy Engineering provided Commissioning Services to meet the Fundamental Building Systems Commissioning Prerequisite (Eap1) and the Enhanced Commissioning LEED Credit (Eac3) of the USGBC’s LEED-CS Rating System, version 2.0.

The project was completed in 2009 with a total construction cost of $3,900,000.

The project is LEED-CS Gold Certified.