Fairfield Medical Center Project Bright

FMC Project Bright for Website

Fairfield Medical Center’s Project “BRIGHT” (Build, Revitalize and Innovate for Greater Healthcare Tomorrow) project will feature 11 OR’s and 36 patient rooms.  The addition will be built between the main hospital and its surgery pavilion, connecting the two buildings. 

Heapy Engineering designed the Mechanical-Electrical systems for the $35 million expansion.  The new surgery wing will allow Fairfield Medical Center to have expanded operating rooms, 100 percent private patient rooms, advanced technology, such as robotic equipment, and improved family waiting areas. 

New patient rooms will be acuity adaptable and allow for future flexibility for varying patient needs.  A new, enhanced entry with improved wayfinding will connect the existing hospital to the new addition.

Heapy Engineering provided Structured Cabling (Voice/Data/CATV), WLAN, and Electronic Safety and Security (Electronic Access Control, Panic Duress & Closed Circuit Television System) Design for the expansion of the existing hospital with a new wing for new operating rooms and medical offices.  A Telecommunications Grounding/Bonding Design was also provided in accordance with TIA/EIA 607A.

©2017 Heapy Engineering site map