The Cincinnati Insurance Company CFC Winton Center

CIC_Winton_CenterHeapy Engineering provided Mechanical-Electrical Design, LEED Consulting services and Commissioning services for the renovation of a former grocery store into a new business continuity center. 

The CFC Winton Center has the following sustainable features built into the project:

  • Increased window, wall, and roof efficiency from the existing building
  • Energy efficient lighting and mechanical design
  • 92% of the existing envelope and structural components were reused
  • 54% waste diverted from landfill
  • The existing furniture was reused such that approximately $97,000 was saved (new furniture would have cost around that much)

The project was completed in 2010. 

This project is LEED Gold Certified.

Download PDF

Return to Commercial Portfolio List

 

©2017 Heapy Engineering site map